1. Product Overview

The EGDZ curved and folding arm explosion-proof barrier gate solves one problem: there is no clear straight run beside the lane. The 90° curved arm stands up along a wall or a piece of equipment once raised; the 180° folding arm doubles back on itself. Both control access where a straight boom cannot physically be installed. Cabinet, mechanism, motor and control unit are flameproof, rated for Zone 1 and Zone 2 areas with Group IIA, IIB or IIC gases.


These are not edge-case specials. Retrofits, process-unit densification, underground factories and jetty decks all share the same condition: the space is already occupied by equipment. The post position is fixed, the pipe rack height is fixed, the available clearance is fixed. Changing the site means shutdown, civil works and re-approval; changing the bar type means changing one drawing.

90° curved

180° folding

Operating time

Marking

≥5 m

≥5 m

5 s

Ex db IIC T4 Gb

These units usually serve the second or third gate rather than the main entrance: process unit side doors, passages under pipe racks, underground ramp entries, substation side gates. Traffic is light, but a failure there is no less serious than at the main gate.

2. When the Site Gives You No Straight Line

A straight boom assumes clear space above it: unbroken, unobstructed, and at least as long as the arm. New-build projects can usually satisfy that, because the post position is set to suit the barrier. Retrofits often cannot.


Three failures are common. First, the post sits tight against the wall and the raised arm sweeps into explosion-proof light fittings or cable trays on top of it. Second, the opening is only about two metres wide, so a straight arm reaches across into the neighbouring lane and drops onto equipment on the other side. Third, the lane is on a slope, and a horizontal arm sits so high at the tip that vehicles pass underneath.


None of these is solved by making the arm longer or shorter, because the problem is not length — it is direction. The arc of the arm has to coincide with the space the site actually offers. That is the reason curved and folding arms exist.


3. The 90° Curved Arm

The 90° arm is not a single straight section: it turns through a right angle near the root, so once raised the main section stands up along the wall or along the equipment face. It converts a vertical lift into a lateral stand, clearing the pipe rack, cable tray or luminaire directly overhead.


The typical location is a side gate where the post is tight against a building or a boundary wall. A straight arm there sweeps outward along the wall, tends to strike wall-mounted fittings, and on landing forms an angle with the wall that eats into the clear width. A curved arm stands up along the wall line, so its swept volume sits above the wall rather than in the lane.


Length starts at 5 m, with a 5-second operating time. Because the arm carries an offset, its inertia distribution differs from a straight arm and the timing cannot borrow from a short straight boom's 1.2 seconds. The bend angle and the distance from root to bend are confirmed against site dimensions, and the unit is counterbalanced before dispatch.


4. The 180° Folding Arm

The 180° arm is made in two sections; when raised, the outer section folds back against the inner one and the whole arm stands in a doubled state. It consumes height instead of length, which makes it the only workable option at very narrow openings with no lateral room on either side.


The typical picture: an opening a little over two metres wide, load-bearing walls or equipment plinths on both sides, and no possibility of the arm extending sideways or standing vertically in the middle of the lane. Raised, the folding arm stands against the post; lowered, it unfolds into a full crossbar and lifts as one piece for vehicle passage.


5. Joints: Where Curved Arms Fail

Nearly every reliability issue with curved and folding arms is concentrated at the bend and the joint. Four rules govern the design.

5.1 Bend Stiffness

The bend is a stress concentration. Self-weight, wind load and travel inertia all add up there, and insufficient stiffness appears as tip droop and an opening bend angle. The EGDZ uses a reinforced bend structure with custom gears and a dedicated gearbox, holding bend deformation within assembly tolerance.

5.2 Joint Clearance and Limits

Play in a folding joint prevents the two sections from aligning when lowered — a kink visible to the eye — and also drifts the limit positions. The joint and limits are set at assembly in the factory and must not be dismantled on site. This matches the flameproof joint requirement: after any re-assembly, the unit must be re-inspected.

5.3 Counterbalance and Spring

The centre of gravity of an arm with a bend does not sit on its axis, so the counterbalance must be matched to the actual bar type and cannot inherit straight-arm values. Incorrect counterbalance means a laboured lift and a heavy landing, which accelerates gear wear.

5.4 A Shared Platform

Curved, folding and straight variants share the 350 × 970 × 300 mm cabinet and mechanism, differing only in boom assembly and counterbalance. On a site mixing several bar types, gearbox, motor and control board remain one spare-part inventory — the most practical benefit of a mixed installation.

6. Specifications and Bar Type Comparison

The table gives the curved and folding configuration; cabinet and electrical data are common with the straight variant. Bend angle, bend position and length are confirmed against site dimensions, and the nameplate takes precedence.

Table 1 EGDZ curved / folding arm specifications

Item

Specification

Product

Curved-arm /   folding-arm explosion-proof barrier gate

Series

EGDZ

Bar type

90° curved;   180° folding

Boom length

≥5 m   (confirmed against site clearance and post position)

Operating time

5 s

Marking

II 2 G Ex db   IIC T4 Gb; II 2 D Ex tb IIIC T130°C Db

Ingress   protection

IP66 (per unit   configuration)

Area of use

Zone 1 and   Zone 2 (gas, IIA/IIB/IIC, T1–T4); Zone 21 and Zone 22 (dust)

Cabinet   dimensions

350 × 970 ×   300 mm

Cabinet   material

Carbon steel,   electrostatic spray, safety yellow

Power supply

240 V 50 Hz   single phase (24 V / 100 V on request)

Rated power

160 W

Drive

Brushless   motor, 1400 r/min no-load

Reduction   ratio

1:50 / 1:150   (per bar type and length)

Operating   temperature (mechanism)

-30°C to +70°C

Relative   humidity

≥85%

Control

Wireless   remote, ≤100 m (open area, clear weather)

Fixing   direction

Left fixed   facing the gate (right fixed on request)

Packing

Standard   export packing (plywood case)

Table 2 Where each bar type applies

Bar    type

Length

Time

Suited    to / not suited to

Straight

2.5   – 6 m

1.2   – 5 s

Suited:   straight lanes with room above. Not: overhead pipe racks, post hard against a   wall

Fence

3   – 4.5 m

3   / 6 s

Suited:   pedestrian and vehicle control. Not: very wide lanes or restricted height

90°   curved

≥5   m

5   s

Suited:   post against a wall, obstruction overhead. Not: no lateral space either side

180°   folding

≥5   m

5   s

Suited:   very narrow openings with no side room. Not: frequent high-speed traffic

Note that both curved and folding arms run at 5 seconds, clearly slower than a short straight boom at 1.2. That is not a product shortfall but a consequence of mass distribution. If a location demands both a curved arm and a 1.2-second cycle, the traffic requirement and the physical space are in conflict — revisit the traffic arrangement rather than forcing the bar type.


7. Applications

These five locations account for most curved and folding arm installations. What they share is space already taken by something else.

Process unit side gates: post against an equipment plinth, process piping directly overhead — a straight arm cannot lift, so the curved arm stands up laterally.

Passages under pipe racks and cable trays: limited headroom; a straight arm hits on lift, a folding arm controls overall height when doubled.

Underground factory ramp entries: sloped, enclosed, with the arm needing to follow the ramp direction.

Jetty decks and loading platforms: open on both sides with no wall to lean on; a folding arm standing against the post is the safer arrangement.

Retrofit projects: posts, foundations and piping already built — changing the bar type is far cheaper than changing the civil works.


8. FAQ

Four questions that come up most often for curved and folding configurations.

Q1: Does the curved or folding arm affect explosion protection?

No. Explosion protection is determined by the cabinet, mechanism, motor and electrical chamber; the arm is a mechanical load and is not part of the flameproof enclosure. However, the bend, joint and counterbalance affect the loads on the mechanism, so the arm must be supplied to the manufacturer's configuration and must not be modified on site.

Q2: Can the bend angle be customised?

90° and 180° are the standard configurations. For unusual angles, provide post position, available clearance and obstruction dimensions at design stage so engineering can judge feasibility. A custom bend changes the load path, so the unit must be re-counterbalanced and factory-tested.

Q3: Can it be installed on a slope?

Yes, with two checks: whether the angle between the lowered arm and the slope still allows vehicles through, and whether the cabinet base stays level. On a ramp the cabinet must still be level; the arm-to-slope angle is set through the bend position, never by tilting the cabinet.

Q4: Will a folding arm sway in wind?

Curved and folding arms present more wind area than a straight arm, and the bend is a stress concentration. On coastal or exposed sites, provide the local basic wind pressure at design stage so the arm can be shortened or reinforced if needed. For installed units, add a rule to park the arm raised during high-wind warnings.


9. Request a Selection Proposal

Curved and folding selection depends on site dimensions, which means two more inputs than a straight boom. Complete the table and, if possible, attach a photo or sketch of the post position; engineering will confirm feasibility and pricing, normally within one working day.

Information    required

Why it matters

Post   position and available clearance

Determines   90° versus 180°, and the bend position

Overhead   and lateral obstructions

Dimensions   and offsets of pipe racks, cable trays, luminaires, plinths

Clear   width and slope

Determines   boom length and landing angle

Area   classification

Zone   1 / Zone 2, and whether Zone 21/22 dust applies